Drolet SGS Istruzioni per gli Interventi Pagina 22

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 29
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 21
LOG INSTALLATION :
1. Remove the glass front as described on page 20.
2. Install the longer log in back of the firebox with locating grooves on top.
3. Install the 14" log in the front of the firebox and to the right. Make sure the log is pushed
against the metal retainer on the burner face.
4. Place the front of the log with a hole in the first notch from the left in the log holder at the
front of the burner and position its back in the back log groove. It should be touching the
14" log.
5. Place the smallest log sideways on top of both the back and 14" logs with the bend toward
the front.
6. Put the glass front assembly back in place.
BACK LOG
FRONT LOG
TOP LOG, HOLED
TOP LOG, SMALL
Vedere la pagina 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 28 29

Commenti su questo manuale

Nessun commento